Much time and effort has recently been put into the installation of the point rods, connecting the signal box to the point tie bars. These are made from the components offered by Model Signal Engineering.
Only the cranks, point rodding stools and the point rodding, made from 0.4mm square bar, have been installed so far. The upper rollers have yet to installed. After everything is glued in position the installation shall be weathered.
Here is a selection of pictures showing progress so far.
No comments:
Post a Comment